Modesto Christian School Expansion Project (55 Acres) - Modesto, CA (more info...)
Boundary/right-of-way surveys, topographic surveys, street improvement projects, construction
staking, sanitary sewer connection coordination, analysis and preliminary design.
Ceres High School - Ceres, CA
Boundary/right-of-way surveys, topographic surveys, street improvement projects, sanitary sewer
connection coordination, analysis and preliminary design.
Manteca Elementary School - Manteca, CA
Boundary/right-of-way surveys, topographic surveys, street improvement projects, construction
staking, sanitary sewer connection coordination, analysis and preliminary design.
Sylvan Elementary School - Modesto, CA
Boundary/right-of-way surveys, topographic surveys, street improvement projects, sanitary sewer
connection coordination, analysis and preliminary design.
Crossroads Masterplan Elementary School No. 11 Site - Riverbank, CA
As part of masterplan completed boundary/right-of-way surveys, topographic surveys, street improvement projects and infrastructure development,surrounding
and relating to the Elementary School No. 11 Site in Riverbank.
Bellevue High School - Merced, CA
MVE provided engineering and project management consultation for this 80-acre High School. Work included the preparation of off-site improvement plans for the widening of 2,000 linear feet of G Street (a major collector street and frontage road to the High School); MVE coordinated with PG&E on the relocation of a utility pole on G Street. Additionally, MVE prepared 750 linear feet of construction improvements for Farmland Avenue and Barclay Avenue. MVE also prepared trail plans, assisting the Merced Union High School District in coordinating a 700 linear foot regional bicycle trail around and through the campus.
Livingston High School - Livingston, CA
MVE is currently working with Merced Union High School District on improvements for the Livingston High School campus. MVE has performed a topographic survey and preliminary improvement plans for Peach Avenue. Additionally, MVE is preparing a preliminary opinion of probable cost (to include water, sewer and storm drainage infrastructure, surface improvements, irrigation relocation and dirt hauling costs) for the Peach Avenue improvements based on preliminary engineering design plans.
Parlier Junior High & High School - Parlier, CA
MVE is currently performing engineering and surveying work for the Parlier Unified School District. MVE’s surveyor are providing a field topography survey and map; that information will then be utilized for a project location map exhibit to include the limits of work, site safety concerns, lay-down areas and site points of access. MVE is also coordinating with Alternative Delivery Solutions on the design-build RFQ and providing bid administration assistance. These services are being provided for both Parlier Junior High School and Parlier High School.
Stockton Unified School District - Stockton, CA
MVE recently contracted with Stockton Unified School District to perform services for Stagg, Edison, Cesar Chavez and Franklin High Schools. The services provided are: record boundary calculations, topography survey & map, CEQA review and documentation.