MVE, Inc.
  • Home
  • Services
    • Urban Design
    • Surveying/Construction Staking
    • Civil Engineering
  • Projects
  • Careers
  • Contact
  • Testimonials
  • MVE Store
back to project highlights

bear river setback levee
yuba, cA

Picture
Our guys are back on the $2.1 million Bear River Setback Levee Project in Yuba City. Construction of the approximately 2,800 linear feet of setback levee should help reduce flood risk for the Wheatland Basin, increase channel capacity, decrease erosion susceptibility, improve habitat, and provide improved maintenance access for inspections and operations during high-water events. Stay tuned  as this project progresses.
similar projects
Picture
  © 2023 MVE. All rights reserved.
Services     Careers     Contact    
  • Home
  • Services
    • Urban Design
    • Surveying/Construction Staking
    • Civil Engineering
  • Projects
  • Careers
  • Contact
  • Testimonials
  • MVE Store