MVE, Inc.
  • Home
  • Services
    • Urban Design
    • Surveying/Construction Staking
    • Civil Engineering
  • Projects
  • Careers
  • Contact
  • Testimonials
  • MVE Store
back to project highlights

Natomas reach b levee
west sacramento, cA

Picture
MVE is back on the Natomas Basin Reach B Levee project in Sacramento. Reach B Levee is about 9.5 miles long. This levee is currently being widen. Fun fact: there are 42 miles of levees surrounding the Natomas Levee.
similar projects
Picture
  © 2023 MVE. All rights reserved.
Services     Careers     Contact    
  • Home
  • Services
    • Urban Design
    • Surveying/Construction Staking
    • Civil Engineering
  • Projects
  • Careers
  • Contact
  • Testimonials
  • MVE Store