Bear River Setback Levee

Client:

Odin Environmental Solutions, LLC

The Bear River Setback Levee project strengthens regional flood protection by constructing approximately 2,800 linear feet of new setback levee, removing a corresponding section of the existing levee, and reinforcing downstream levee segments along the north bank of the Bear River. These improvements help reduce erosion and enhance the long-term resilience of the flood control system. MVE provided construction surveying and staking services to support the accurate layout and construction of the levee improvements.

Location:

Wheatland, CA