top of page
Kings River Pipeline
Client:
Garney Construction
Kings River Pipeline Phase 2 included the construction of a new 13-mile-long, 72-inch-diameter raw water pipeline to convey surface water from the Kings River to the Southeast Surface Water Treatment Facility. The pipeline is a critical component of the region’s water infrastructure, improving the reliable delivery of surface water for treatment and distribution. MVE provided construction surveying and staking services to support the accurate layout and installation of the pipeline.
Location:
Fresno, CA

bottom of page





