top of page
Modesto Levee Seepage Berm RD 2091
Client:
Teichert Construction
MVE provided land surveying services for the Modesto Levee Seepage Berm project.
The project saw the construction of approximately 2.25 miles of seepage berms along five different reaches of the San Joaquin River levee to prevent water from seeping into the landside of the river. Each berm is approximately 40 to 70 feet wide and 6 to 8 feet thick.
Location:
Modesto, CA
bottom of page